Bid Abstract

SP 001-628-012 - Mill and Overlay - CSAH 28Central Specialities Inc Anderson Brothers Construction Company of Brainerd LLC Tri City Paving 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$166,000.00$166,000.00$71,517.06$71,517.06$65,000.00$65,000.00
2051.501MAINT & RESTORATION OF HAUL ROADSLS1$1.00$1.00$1.00$1.00$1.00$1.00
2101.511CLEARING & GRUBBINGLS1$60,000.00$60,000.00$68,000.00$68,000.00$45,000.00$45,000.00
2104.501REMOVE PIPE CULVERTSL F4,106$10.00$41,060.00$12.66$51,981.96$12.00$49,272.00
2104.505REMOVE BITUMINOUS PAVEMENTS Y8,096$4.22$34,165.12$1.68$13,601.28$1.25$10,120.00
2104.505REMOVE CONCRETE DRIVEWAY PAVEMENTS Y100$8.00$800.00$11.00$1,100.00$10.00$1,000.00
2104.511SAWING CONCRETE PAVEMENTL F40$1.00$40.00$11.00$440.00$10.00$400.00
2104.513SAWING BITUMINOUS PAVEMENTL F236$1.00$236.00$2.75$649.00$1.50$354.00
2105.501COMMON EXCAVATION (P)C Y4,430$5.00$22,150.00$7.75$34,332.50$8.00$35,440.00
2105.523COMMON BORROW (EV)C Y13,438$13.76$184,906.88$10.25$137,739.50$10.00$134,380.00
2112.501SUBGRADE PREPARATIONRDST423$50.00$21,150.00$18.00$7,614.00$79.00$33,417.00
2118.502AGGREGATE SURFACING (LV), CLASS 1C Y775$29.00$22,475.00$32.00$24,800.00$22.40$17,360.00
2211.502AGGREGATE BASE (LV) CLASS 5C Y4,066$18.00$73,188.00$17.50$71,155.00$20.00$81,320.00
2231.501BITUMINOUS PATCHING MIXTURETON57$100.00$5,700.00$100.00$5,700.00$100.00$5,700.00
2232.501MILL BITUMINOUS SURFACE (1.0")S Y73,571$0.70$51,499.70$0.64$47,085.44$0.70$51,499.70
2232.501MILL BITUMINOUS SURFACE (1.5")S Y36,188$0.80$28,950.40$0.78$28,226.64$1.00$36,188.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGAL13,426$0.01$134.26$2.50$33,565.00$2.50$33,565.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (2,B)TON19,817$43.10$854,112.70$50.00$990,850.00$48.50$961,124.50
2501.51118" CS PIPE CULVERTL F294$22.50$6,615.00$33.40$9,819.60$35.00$10,290.00
2501.51115" CS PIPE CULVERTL F3,712$19.00$70,528.00$29.44$109,281.28$30.00$111,360.00
2501.51124" CS PIPE CULVERTL F56$28.00$1,568.00$39.05$2,186.80$40.00$2,240.00
2501.51148" CS PIPE CULVERTL F86$155.00$13,330.00$235.34$20,239.24$250.00$21,500.00
2501.51524" GS PIPE APRONEACH2$287.00$574.00$301.82$603.64$300.00$600.00
2501.51515" GS PIPE APRONEACH182$147.00$26,754.00$183.63$33,420.66$200.00$36,400.00
2501.51518" GS PIPE APRONEACH16$205.00$3,280.00$342.98$5,487.68$400.00$6,400.00
2501.56118" RC PIPE CULVERT DES 3006 CL IIIL F78$84.00$6,552.00$100.26$7,820.28$100.00$7,800.00
2501.56918" RC SAFETY APRONEACH2$872.00$1,744.00$2,216.18$4,432.36$2,500.00$5,000.00
2540.602RELOCATE MAIL BOX SUPPORTEACH13$55.00$715.00$58.04$754.52$120.00$1,560.00
2540.602MAIL BOX SUPPORTEACH77$105.00$8,085.00$100.26$7,720.02$120.00$9,240.00
2550.602RELOCATE HANDHOLEEACH1$1,385.00$1,385.00$1,356.09$1,356.09$4,000.00$4,000.00
2554.501TRAFFIC BARRIER DESIGN B8338L F4,963$17.00$84,371.00$17.94$89,036.22$17.00$84,371.00
2554.501TRAFFIC BARRIER DESIGN B8307L F75$31.00$2,325.00$32.72$2,454.00$35.00$2,625.00
2554.501TRAFFIC BARRIER DESIGN 8331L F6,488$7.75$50,282.00$8.18$53,071.84$8.50$55,148.00
2554.521ANCHORAGE ASSEMBLY - CABLEEACH22$1,337.00$29,414.00$1,410.97$31,041.34$1,400.00$30,800.00
2554.523END TREATMENT-ENERGY ABSORBING TERMINALEACH15$2,225.00$33,375.00$2,348.10$35,221.50$2,500.00$37,500.00
2563.601TRAFFIC CONTROLLS1$17,800.00$17,800.00$18,784.76$18,784.76$20,000.00$20,000.00
2565.602RIGID PVC LOOP DETECTOR 6'X6'EACH1$1,165.00$1,165.00$1,018.39$1,018.39$3,000.00$3,000.00
2573.502SILT FENCE, TYPE HIL F7,595$2.00$15,190.00$2.11$16,025.45$4.95$37,595.25
2574.508FERTILIZER TYPE 1LB4,361$0.69$3,009.09$0.73$3,183.53$1.00$4,361.00
2574.525COMMON TOPSOIL BORROWC Y350$25.00$8,750.00$25.79$9,026.50$25.00$8,750.00
2575.501SEEDING (P)ACRE14.5$400.00$5,800.00$422.13$6,120.89$100.00$1,450.00
2575.502SEED MIXTURE 25-141LB858$3.75$3,217.50$3.96$3,397.68$4.00$3,432.00
2575.511MULCH MATERIAL TYPE 1TON11.6$225.00$2,610.00$237.45$2,754.42$350.00$4,060.00
2575.519DISK ANCHORING (P)ACRE5.8$250.00$1,450.00$263.83$1,530.21$100.00$580.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3S Y44,477$1.45$64,491.65$1.32$58,709.64$1.65$73,387.05
2575.571RAPID STABILIZATION METHOD 3MGAL50.4$200.00$10,080.00$158.30$7,978.32$1,200.00$60,480.00
2580.603INTERIM PAVEMENT MARKINGL F58,266$0.15$8,739.90$0.22$12,818.52$0.30$17,479.80
2582.5024" SOLID LINE YELLOW-EPOXYL F56,105$0.22$12,343.10$0.23$12,904.15$0.22$12,343.10
2582.5024" BROKEN LINE YELLOW-EPOXYL F4,321$0.22$950.62$0.23$993.83$0.22$950.62
2582.602PAVT MSSG (RR XING) EPOXY (WR)EACH1$1,300.00$1,300.00$1,371.92$1,371.92$1,300.00$1,300.00
2582.60324" STOP LINE WHITE-EPOXY (WR)L F24$12.40$297.60$13.09$314.16$12.40$297.60
2582.6036" SOLID LINE WHITE-EPOXY (WR)L F86,280$0.69$59,533.20$0.73$62,984.40$0.69$59,533.20
 Totals for project SP 001-628-012 $2,124,193.72 $2,222,222.22 $2,296,974.82
 
Contract Total:$2,124,193.72$2,222,222.22$2,296,974.82