Bid Abstract

CP 001-074-001 - Bituminous OverlayAnderson Brothers Construction Company of Brainerd LLC Hardrives, Inc Duininck, Inc. Knife River 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$15,100.00$15,100.00$30,584.00$30,584.00$28,000.00$28,000.00$55,000.00$55,000.00
2051.501MAINT & RESTORATION OF HAUL ROADSLS1$1.00$1.00$1.00$1.00$1.00$1.00$1.00$1.00
2101.511CLEARING & GRUBBINGLS1$2,100.00$2,100.00$508.71$508.71$4,500.00$4,500.00$2,500.00$2,500.00
2104.501REMOVE PIPE CULVERTSL F172$9.50$1,634.00$9.16$1,575.52$10.00$1,720.00$9.00$1,548.00
2104.501REMOVE CURBL F100$9.50$950.00$9.16$916.00$5.00$500.00$4.00$400.00
2104.503REMOVE CONCRETE SIDEWALKS F352$1.05$369.60$1.02$359.04$2.00$704.00$2.00$704.00
2104.505REMOVE BITUMINOUS PAVEMENTS Y4,869$3.25$15,824.25$3.05$14,850.45$6.00$29,214.00$4.50$21,910.50
2104.509REMOVE DRAINAGE STRUCTUREEACH2$210.00$420.00$203.49$406.98$300.00$600.00$245.00$490.00
2105.501COMMON EXCAVATIONC Y2,146$8.50$18,241.00$8.14$17,468.44$8.00$17,168.00$8.50$18,241.00
2105.603SHOULDER EXCAVATIONL F13,562$0.24$3,254.88$0.34$4,611.08$0.23$3,119.26$0.28$3,797.36
2118.502AGGREGATE SURFACING (LV), CLASS 1C Y368$30.00$11,040.00$24.18$8,898.24$37.27$13,715.36$27.50$10,120.00
2211.502AGGREGATE BASE (LV) CLASS 5C Y419$25.50$10,684.50$25.88$10,843.72$41.00$17,179.00$33.00$13,827.00
2211.503AGGREGATE BASE (CV) CLASS 5C Y1,484$26.00$38,584.00$21.60$32,054.40$32.00$47,488.00$35.00$51,940.00
2232.501MILL BITUMINOUS SURFACE (1.5")S Y310$5.25$1,627.50$0.68$210.80$3.78$1,171.80$6.00$1,860.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGAL3,037$1.85$5,618.45$0.01$30.37$0.01$30.37$1.50$4,555.50
2360.501TYPE SP 9.5 WEARING COURSE MIX (2,B)TON3,765$45.00$169,425.00$48.00$180,720.00$44.00$165,660.00$42.25$159,071.25
2451.501STRUCTURE EXCAVATION CLASS UC Y965$16.00$15,440.00$15.26$14,725.90$10.00$9,650.00$9.50$9,167.50
2451.503GRANULAR BACKFILL (LV)C Y1,084$13.75$14,905.00$13.23$14,341.32$12.00$13,008.00$16.00$17,344.00
2451.513FINE FILTER AGGREGATE (CV)C Y3$26.50$79.50$25.44$76.32$65.00$195.00$65.00$195.00
2501.51512" RC PIPE APRONEACH1$450.00$450.00$432.40$432.40$500.00$500.00$465.00$465.00
2501.51524" RC PIPE APRONEACH4$635.00$2,540.00$610.45$2,441.80$8.00$32.00$745.00$2,980.00
2501.56112" RC PIPE CULVERT DES 3006L F78$31.50$2,457.00$30.52$2,380.56$40.00$3,120.00$39.00$3,042.00
2501.56124" RC PIPE CULVERT DES 3006L F108$47.50$5,130.00$45.78$4,944.24$70.00$7,560.00$69.00$7,452.00
2502.5416" PERF TP PIPE DRAIN (MOD)L F125$9.50$1,187.50$9.16$1,145.00$20.00$2,500.00$22.00$2,750.00
2503.602CONNECT TO EXISTING STORM SEWEREACH1$525.00$525.00$508.71$508.71$1,000.00$1,000.00$1,000.00$1,000.00
2504.602ADJUST GATE VALVE & BOXEACH5$210.00$1,050.00$203.48$1,017.40$210.00$1,050.00$400.00$2,000.00
2504.602ADJUST HYDRANTEACH1$1,600.00$1,600.00$1,526.12$1,526.12$2,000.00$2,000.00$2,000.00$2,000.00
2506.502CONST DRAINAGE STRUCTURE DES 48-4020EACH2$1,600.00$3,200.00$1,526.12$3,052.24$3,000.00$6,000.00$2,885.00$5,770.00
2506.502CONST DRAINAGE STRUCTURE DESIGN HEACH2$1,000.00$2,000.00$559.58$1,119.16$2,000.00$4,000.00$1,985.00$3,970.00
2506.522ADJUST FRAME & RING CASTINGEACH3$500.00$1,500.00$203.48$610.44$500.00$1,500.00$650.00$1,950.00
2521.5014" CONCRETE WALKS F4,662$4.70$21,911.40$4.53$21,118.86$4.45$20,745.90$4.45$20,745.90
2531.501CONCRETE CURB & GUTTER DESIGN D424L F1,994$17.00$33,898.00$16.28$32,462.32$16.00$31,904.00$16.00$31,904.00
2531.5076" CONCRETE DRIVEWAY PAVEMENTS Y181$49.00$8,869.00$47.31$8,563.11$46.50$8,416.50$46.50$8,416.50
2540.602MAIL BOX SUPPORTEACH21$95.00$1,995.00$91.57$1,922.97$90.00$1,890.00$90.00$1,890.00
2563.601TRAFFIC CONTROLLS1$1,100.00$1,100.00$1,526.12$1,526.12$1,000.00$1,000.00$3,000.00$3,000.00
2573.502SILT FENCE, TYPE HIL F260$3.15$819.00$3.05$793.00$3.00$780.00$3.00$780.00
2573.530STORM DRAIN INLET PROTECTIONEACH4$130.00$520.00$152.61$610.44$150.00$600.00$150.00$600.00
2574.508FERTILIZER TYPE 3LB210$1.00$210.00$0.97$203.70$0.95$199.50$0.95$199.50
2575.501SEEDINGACRE0.6$2,200.00$1,320.00$2,034.83$1,220.90$2,000.00$1,200.00$2,000.00$1,200.00
2575.502SEED MIXTURE 25-131LB132$3.70$488.40$3.56$469.92$3.50$462.00$3.50$462.00
2575.511MULCH MATERIAL TYPE 3TON1.2$525.00$630.00$508.71$610.45$500.00$600.00$500.00$600.00
2575.519DISK ANCHORINGACRE0.6$525.00$315.00$508.70$305.22$750.00$450.00$500.00$300.00
2575.571RAPID STABILIZATION METHOD 3MGAL21$55.00$1,155.00$50.87$1,068.27$50.00$1,050.00$50.00$1,050.00
2580.603INTERIM PAVEMENT MARKINGL F16,462$0.13$2,140.06$0.12$1,975.44$0.12$1,975.44$0.12$1,975.44
2582.5024" SOLID LINE EPOXYL F23,385$0.18$4,209.30$0.18$4,209.30$0.17$3,975.45$0.17$3,975.45
2582.5024" BROKEN LINE EPOXYL F1,215$0.18$218.70$0.18$218.70$0.17$206.55$0.17$206.55
 Totals for project CP 001-074-001 $426,737.04 $429,639.08 $458,341.13 $483,356.45
 
Contract Total:$426,737.04$429,639.08$458,341.13$483,356.45