Contract Bid Abstract

SP 001-610-025 - Aggregate Base and Bituminous Paving - CSAH 10Anderson Brothers Construction Company of Brainerd LLC Knife River Hardrives, Inc KGM Gladen Construction Tri City Paving Central Specialities Inc Ulland Brothers Hammerlund Construction Inc Landwehr Construction 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS0.57$55,000.00$31,350.00$100,000.00$57,000.00$141,500.00$80,655.00$165,000.00$94,050.00$242,000.00$137,940.00$210,000.00$119,700.00$350,000.00$199,500.00$128,000.00$72,960.00$325,000.00$185,250.00$71,000.00$40,470.00
2211.501AGGREGATE BASE CLASS 5TON904$15.25$13,786.00$15.75$14,238.00$18.10$16,362.40$15.10$13,650.40$14.60$13,198.40$20.00$18,080.00$13.00$11,752.00$19.60$17,718.40$15.75$14,238.00$16.50$14,916.00
2211.503AGGREGATE BASE (CV) CLASS 5C Y38,231$16.00$611,696.00$20.50$783,735.50$21.98$840,317.38$16.88$645,339.28$22.50$860,197.50$19.90$760,796.90$25.00$955,775.00$24.00$917,544.00$17.50$669,042.50$17.25$659,484.75
2221.501SHOULDER BASE AGGREGATE CLASS 1TON4,357$14.00$60,998.00$13.65$59,473.05$17.00$74,069.00$16.25$70,801.25$18.75$81,693.75$20.00$87,140.00$15.00$65,355.00$18.00$78,426.00$22.00$95,854.00$15.50$67,533.50
2357.502BITUMINOUS MATERIAL FOR TACK COATGAL6,750$2.50$16,875.00$2.40$16,200.00$2.25$15,187.50$2.85$19,237.50$2.35$15,862.50$2.50$16,875.00$0.01$67.50$2.40$16,200.00$2.50$16,875.00$2.75$18,562.50
2360.501TYPE SP 12.5 WEARING COURSE MIX (2,C)TON26,415$60.00$1,584,900.00$63.00$1,664,145.00$58.42$1,543,164.30$57.30$1,513,579.50$57.80$1,526,787.00$67.00$1,769,805.00$64.46$1,702,710.90$60.30$1,592,824.50$58.90$1,555,843.50$67.50$1,783,012.50
2563.601TRAFFIC CONTROLLS0.57$7,000.00$3,990.00$6,500.00$3,705.00$8,563.25$4,881.05$15,000.00$8,550.00$15,400.00$8,778.00$15,000.00$8,550.00$10,400.00$5,928.00$6,500.00$3,705.00$27,000.00$15,390.00$18,730.00$10,676.10
2582.5024" SOLID LINE WHITE-EPOXYL F74,050$0.20$14,810.00$0.19$14,069.50$0.19$14,069.50$0.20$14,810.00$0.21$15,550.50$0.28$20,734.00$0.19$14,069.50$0.19$14,069.50$0.19$14,069.50$0.20$14,810.00
2582.5024" SOLID LINE YELLOW-EPOXYL F54,150$0.20$10,830.00$0.19$10,288.50$0.19$10,288.50$0.21$11,371.50$0.21$11,371.50$0.28$15,162.00$0.19$10,288.50$0.19$10,288.50$0.20$10,830.00$0.20$10,830.00
2582.5024" BROKEN LINE YELLOW-EPOXYL F2,780$0.20$556.00$0.19$528.20$0.19$528.20$0.21$583.80$0.21$583.80$0.28$778.40$0.19$528.20$0.19$528.20$0.20$556.00$0.20$556.00
 Totals for project SP 001-610-025 $2,349,791.00 $2,623,382.75 $2,599,522.83 $2,391,973.23 $2,671,962.95 $2,817,621.30 $2,965,974.60 $2,724,264.10 $2,577,948.50 $2,620,851.35
 
SP 01-610-22 - Grading CSAH 10Anderson Brothers Construction Company of Brainerd LLC Knife River Hardrives, Inc KGM Gladen Construction Tri City Paving Central Specialities Inc Ulland Brothers Hammerlund Construction Inc Landwehr Construction 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS0.43$141,000.00$60,630.00$185,000.00$79,550.00$118,000.00$50,740.00$186,000.00$79,980.00$242,000.00$104,060.00$210,000.00$90,300.00$350,000.00$150,500.00$163,500.00$70,305.00$325,000.00$139,750.00$105,000.00$45,150.00
2051.501MAINT & RESTORATION OF HAUL ROADSLS1$1.00$1.00$1,000.00$1,000.00$1.00$1.00$2,500.00$2,500.00$2,500.00$2,500.00$1.00$1.00$1.00$1.00$5,000.00$5,000.00$8,500.00$8,500.00$15,700.00$15,700.00
2101.511CLEARING & GRUBBINGLS1$52,500.00$52,500.00$50,000.00$50,000.00$50,500.00$50,500.00$75,000.00$75,000.00$90,000.00$90,000.00$50,000.00$50,000.00$50,000.00$50,000.00$50,000.00$50,000.00$57,000.00$57,000.00$198,100.00$198,100.00
2104.501REMOVE PIPE CULVERTSL F1,905$10.50$20,002.50$10.00$19,050.00$10.07$19,183.35$8.00$15,240.00$15.00$28,575.00$10.00$19,050.00$10.00$19,050.00$10.00$19,050.00$7.00$13,335.00$11.80$22,479.00
2104.505REMOVE BITUMINOUS PAVEMENTS Y6,078$1.80$10,940.40$3.90$23,704.20$1.93$11,730.54$2.30$13,979.40$4.50$27,351.00$2.25$13,675.50$6.29$38,230.62$2.50$15,195.00$3.00$18,234.00$3.10$18,841.80
2104.513SAWING BIT PAVEMENT (FULL DEPTH)L F282$3.50$987.00$3.88$1,094.16$3.56$1,003.92$3.00$846.00$5.25$1,480.50$3.00$846.00$0.01$2.82$2.00$564.00$2.00$564.00$4.75$1,339.50
2104.523SALVAGE CONCRETE APRONEACH8$260.00$2,080.00$250.00$2,000.00$260.00$2,080.00$300.00$2,400.00$250.00$2,000.00$250.00$2,000.00$250.00$2,000.00$300.00$2,400.00$150.00$1,200.00$155.00$1,240.00
2105.501COMMON EXCAVATION (P)C Y96,143$4.25$408,607.75$4.00$384,572.00$4.25$408,607.75$3.53$339,384.79$4.30$413,414.90$4.10$394,186.30$4.10$394,186.30$4.75$456,679.25$5.50$528,786.50$4.80$461,486.40
2105.521GRANULAR BORROW (EV)C Y142,672$8.50$1,212,712.00$8.00$1,141,376.00$8.36$1,192,737.92$10.95$1,562,258.40$8.05$1,148,509.60$8.30$1,184,177.60$8.30$1,184,177.60$10.55$1,505,189.60$11.00$1,569,392.00$11.10$1,583,659.20
2105.603OBLITERATE OLD ROADWAYL F819$21.00$17,199.00$20.00$16,380.00$20.50$16,789.50$8.00$6,552.00$5.50$4,504.50$20.00$16,380.00$20.00$16,380.00$4.00$3,276.00$4.00$3,276.00$7.70$6,306.30
2105.604GEOTEXTILE FABRIC TYPE VS Y37,272$1.75$65,226.00$1.85$68,953.20$1.86$69,325.92$2.00$74,544.00$1.55$57,771.60$1.85$68,953.20$1.85$68,953.20$1.60$59,635.20$1.50$55,908.00$2.25$83,862.00
2451.513FINE FILTER AGGREGATE (CV) (P)C Y45$52.75$2,373.75$50.00$2,250.00$50.37$2,266.65$35.00$1,575.00$50.00$2,250.00$50.00$2,250.00$50.00$2,250.00$40.00$1,800.00$75.00$3,375.00$34.75$1,563.75
2501.51142" RC PIPE CULVERTL F74$165.00$12,210.00$156.00$11,544.00$157.16$11,629.84$120.00$8,880.00$108.65$8,040.10$156.00$11,544.00$156.00$11,544.00$115.00$8,510.00$105.00$7,770.00$150.65$11,148.10
2501.51118" RC PIPE CULVERTL F54$71.25$3,847.50$67.50$3,645.00$68.00$3,672.00$42.00$2,268.00$34.20$1,846.80$67.50$3,645.00$67.50$3,645.00$55.00$2,970.00$35.00$1,890.00$28.40$1,533.60
2501.51118" CS PIPE CULVERTL F130$28.50$3,705.00$27.00$3,510.00$28.00$3,640.00$35.00$4,550.00$29.70$3,861.00$27.00$3,510.00$27.00$3,510.00$35.00$4,550.00$28.00$3,640.00$30.15$3,919.50
2501.51115" CS PIPE CULVERTL F1,652$26.50$43,778.00$25.00$41,300.00$26.00$42,952.00$30.00$49,560.00$25.15$41,547.80$25.00$41,300.00$25.00$41,300.00$32.00$52,864.00$27.00$44,604.00$27.55$45,512.60
2501.51136" RC PIPE CULVERTL F86$135.00$11,610.00$130.00$11,180.00$130.97$11,263.42$95.00$8,170.00$82.45$7,090.70$130.00$11,180.00$130.00$11,180.00$114.00$9,804.00$80.00$6,880.00$122.00$10,492.00
2501.51118" RC PIPE CULVERTL F660$71.25$47,025.00$67.50$44,550.00$68.00$44,880.00$42.00$27,720.00$34.20$22,572.00$67.50$44,550.00$67.50$44,550.00$55.00$36,300.00$35.00$23,100.00$28.40$18,744.00
2501.51124" RC PIPE CULVERTL F376$81.00$30,456.00$76.50$28,764.00$77.07$28,978.32$50.00$18,800.00$42.00$15,792.00$76.50$28,764.00$76.50$28,764.00$64.00$24,064.00$40.00$15,040.00$72.40$27,222.40
2501.51124" CS PIPE CULVERTL F136$37.00$5,032.00$35.00$4,760.00$35.26$4,795.36$40.00$5,440.00$36.90$5,018.40$35.00$4,760.00$35.00$4,760.00$46.00$6,256.00$32.00$4,352.00$40.40$5,494.40
2501.51130" RC PIPE CULVERT CLASS IIIL F86$100.00$8,600.00$92.50$7,955.00$93.19$8,014.34$72.00$6,192.00$61.10$5,254.60$92.50$7,955.00$92.50$7,955.00$88.00$7,568.00$57.00$4,902.00$96.80$8,324.80
2501.51524" RC PIPE APRONEACH10$615.00$6,150.00$580.00$5,800.00$584.32$5,843.20$625.00$6,250.00$289.40$2,894.00$580.00$5,800.00$580.00$5,800.00$850.00$8,500.00$600.00$6,000.00$665.00$6,650.00
2501.51518" GS PIPE APRONEACH6$190.00$1,140.00$180.00$1,080.00$181.34$1,088.04$225.00$1,350.00$187.80$1,126.80$180.00$1,080.00$180.00$1,080.00$160.00$960.00$175.00$1,050.00$235.00$1,410.00
2501.51518" GS PIPE APRONEACH2$190.00$380.00$180.00$360.00$181.34$362.68$225.00$450.00$187.80$375.60$180.00$360.00$180.00$360.00$160.00$320.00$175.00$350.00$235.00$470.00
2501.51524" GS PIPE APRONEACH6$265.00$1,590.00$250.00$1,500.00$251.86$1,511.16$250.00$1,500.00$230.00$1,380.00$250.00$1,500.00$250.00$1,500.00$250.00$1,500.00$185.00$1,110.00$305.00$1,830.00
2501.51518" RC PIPE APRONEACH20$550.00$11,000.00$525.00$10,500.00$528.91$10,578.20$560.00$11,200.00$478.00$9,560.00$525.00$10,500.00$525.00$10,500.00$650.00$13,000.00$525.00$10,500.00$540.00$10,800.00
2501.51530" RC PIPE APRONEACH2$750.00$1,500.00$700.00$1,400.00$705.21$1,410.42$800.00$1,600.00$733.75$1,467.50$700.00$1,400.00$700.00$1,400.00$950.00$1,900.00$775.00$1,550.00$830.00$1,660.00
2501.51536" RC PIPE APRONEACH2$1,055.00$2,110.00$1,000.00$2,000.00$1,007.44$2,014.88$1,100.00$2,200.00$1,025.00$2,050.00$1,000.00$2,000.00$1,000.00$2,000.00$1,200.00$2,400.00$1,150.00$2,300.00$1,325.00$2,650.00
2501.51515" GS PIPE APRONEACH82$180.00$14,760.00$170.00$13,940.00$171.26$14,043.32$190.00$15,580.00$150.00$12,300.00$170.00$13,940.00$170.00$13,940.00$150.00$12,300.00$135.00$11,070.00$225.00$18,450.00
2501.51542" RC PIPE APRONEACH2$1,250.00$2,500.00$1,200.00$2,400.00$1,208.93$2,417.86$1,500.00$3,000.00$1,242.00$2,484.00$1,200.00$2,400.00$1,200.00$2,400.00$1,600.00$3,200.00$1,400.00$2,800.00$1,560.00$3,120.00
2501.573INSTALL CONCRETE APRONEACH8$265.00$2,120.00$250.00$2,000.00$251.86$2,014.88$625.00$5,000.00$300.00$2,400.00$250.00$2,000.00$250.00$2,000.00$350.00$2,800.00$350.00$2,800.00$425.00$3,400.00
2502.5416" PERF TP PIPE DRAIN (MOD)L F475$14.75$7,006.25$14.00$6,650.00$14.10$6,697.50$5.30$2,517.50$13.20$6,270.00$14.00$6,650.00$14.00$6,650.00$20.00$9,500.00$12.50$5,937.50$15.10$7,172.50
2503.51118" CP PIPE SEWERL F224$23.25$5,208.00$22.00$4,928.00$22.16$4,963.84$35.00$7,840.00$31.00$6,944.00$22.00$4,928.00$22.00$4,928.00$38.00$8,512.00$40.00$8,960.00$30.00$6,720.00
2503.60218" CP WATERTIGHT TEE FITTINGEACH1$370.00$370.00$350.00$350.00$352.60$352.60$1,100.00$1,100.00$950.00$950.00$350.00$350.00$350.00$350.00$500.00$500.00$800.00$800.00$415.00$415.00
2504.602ADJUST GATE VALVE & BOXEACH6$160.00$960.00$750.00$4,500.00$247.32$1,483.92$250.00$1,500.00$225.00$1,350.00$250.00$1,500.00$250.00$1,500.00$200.00$1,200.00$200.00$1,200.00$315.00$1,890.00
2506.502CONSTRUCT DRAINAGE STRUCTURE DESIGN SDEACH1$2,150.00$2,150.00$2,050.00$2,050.00$2,065.25$2,065.25$1,900.00$1,900.00$2,700.00$2,700.00$2,050.00$2,050.00$2,050.00$2,050.00$1,900.00$1,900.00$1,800.00$1,800.00$1,600.00$1,600.00
2506.502CONST DRAINAGE STRUCTURE DESIGN HEACH1$1,850.00$1,850.00$1,750.00$1,750.00$1,763.02$1,763.02$1,800.00$1,800.00$1,850.00$1,850.00$1,750.00$1,750.00$1,750.00$1,750.00$1,500.00$1,500.00$1,600.00$1,600.00$2,700.00$2,700.00
2506.502CONST DRAINAGE STRUCTURE DESIGN FEACH1$2,250.00$2,250.00$2,150.00$2,150.00$2,166.00$2,166.00$4,000.00$4,000.00$2,532.00$2,532.00$2,150.00$2,150.00$2,150.00$2,150.00$1,900.00$1,900.00$2,200.00$2,200.00$3,450.00$3,450.00
2511.501RANDOM RIPRAP CLASS IIC Y303$65.00$19,695.00$60.00$18,180.00$60.45$18,316.35$60.00$18,180.00$80.00$24,240.00$60.00$18,180.00$60.00$18,180.00$50.00$15,150.00$50.00$15,150.00$43.75$13,256.25
2531.501CONCRETE CURB & GUTTER DESIGN S524L F2,647$15.50$41,028.50$14.75$39,043.25$21.16$56,010.52$15.50$41,028.50$16.65$44,072.55$20.00$52,940.00$14.75$39,043.25$14.75$39,043.25$14.75$39,043.25$17.65$46,719.55
2554.501TRAFFIC BARRIER DESIGN SPECIALL F100$75.00$7,500.00$71.75$7,175.00$72.28$7,228.00$75.00$7,500.00$75.00$7,500.00$75.00$7,500.00$71.75$7,175.00$72.00$7,200.00$71.75$7,175.00$87.00$8,700.00
2554.501TRAFFIC BARRIER DESIGN B8338L F2,425$18.00$43,650.00$16.90$40,982.50$17.03$41,297.75$17.75$43,043.75$18.50$44,862.50$17.00$41,225.00$16.90$40,982.50$17.00$41,225.00$16.90$40,982.50$20.50$49,712.50
2554.523END TREATMENT-ENERGY ABSORBING TERMINALEACH10$2,150.00$21,500.00$2,021.00$20,210.00$2,036.04$20,360.40$2,200.00$22,000.00$2,500.00$25,000.00$2,021.00$20,210.00$2,021.00$20,210.00$2,000.00$20,000.00$2,021.00$20,210.00$2,450.00$24,500.00
2563.601TRAFFIC CONTROLLS0.43$6,850.00$2,945.50$6,500.00$2,795.00$8,563.23$3,682.19$15,000.00$6,450.00$15,400.00$6,622.00$15,000.00$6,450.00$10,400.00$4,472.00$6,500.00$2,795.00$27,000.00$11,610.00$19,250.00$8,277.50
2573.502SILT FENCE, TYPE PAL F33,365$2.25$75,071.25$2.15$71,734.75$1.91$63,727.15$1.75$58,388.75$2.20$73,403.00$1.90$63,393.50$2.15$71,734.75$2.15$71,734.75$2.15$71,734.75$2.65$88,417.25
2573.504SANDBAG BARRIERS F300$10.00$3,000.00$4.00$1,200.00$1.00$300.00$4.25$1,275.00$25.00$7,500.00$20.00$6,000.00$5.00$1,500.00$5.50$1,650.00$19.00$5,700.00$4.00$1,200.00
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERL F740$23.50$17,390.00$22.50$16,650.00$17.08$12,639.20$19.00$14,060.00$23.50$17,390.00$20.00$14,800.00$22.50$16,650.00$23.00$17,020.00$22.50$16,650.00$28.00$20,720.00
2573.530STORM DRAIN INLET PROTECTIONEACH3$275.00$825.00$250.00$750.00$196.45$589.35$290.00$870.00$250.00$750.00$200.00$600.00$150.00$450.00$225.00$675.00$125.00$375.00$245.00$735.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWL F544$3.25$1,768.00$3.05$1,659.20$5.04$2,741.76$3.95$2,148.80$3.25$1,768.00$5.00$2,720.00$3.05$1,659.20$3.00$1,632.00$3.05$1,659.20$3.80$2,067.20
2573.602ROCK DITCH CHECKEACH26$525.00$13,650.00$500.00$13,000.00$503.72$13,096.72$390.00$10,140.00$1,150.00$29,900.00$500.00$13,000.00$500.00$13,000.00$95.00$2,470.00$200.00$5,200.00$900.00$23,400.00
2573.610SEDIMENT REMOVALHOUR12$185.00$2,220.00$175.00$2,100.00$176.30$2,115.60$180.00$2,160.00$275.00$3,300.00$175.00$2,100.00$175.00$2,100.00$180.00$2,160.00$225.00$2,700.00$325.00$3,900.00
2574.508FERTILIZER TYPE 3LB19,320$0.80$15,456.00$0.76$14,683.20$0.59$11,398.80$0.58$11,205.60$0.82$15,842.40$1.00$19,320.00$0.76$14,683.20$0.80$15,456.00$0.76$14,683.20$0.95$18,354.00
2575.501SEEDING (P)ACRE55.2$80.00$4,416.00$75.00$4,140.00$302.23$16,683.10$105.00$5,796.00$77.50$4,278.00$300.00$16,560.00$75.00$4,140.00$75.00$4,140.00$75.00$4,140.00$93.00$5,133.60
2575.502SEED MIXTURE 25-141LB3,257$3.90$12,702.30$3.68$11,985.76$3.53$11,497.21$3.70$12,050.90$3.79$12,344.03$3.50$11,399.50$3.68$11,985.76$3.70$12,050.90$3.68$11,985.76$4.50$14,656.50
2575.511MULCH MATERIAL TYPE 1TON111$275.00$30,525.00$255.00$28,305.00$151.00$16,761.00$263.00$29,193.00$260.00$28,860.00$150.00$16,650.00$255.00$28,305.00$255.00$28,305.00$255.00$28,305.00$315.00$34,965.00
2575.519DISK ANCHORINGACRE55.2$80.00$4,416.00$75.00$4,140.00$196.00$10,819.20$368.00$20,313.60$77.50$4,278.00$195.00$10,764.00$75.00$4,140.00$75.00$4,140.00$75.00$4,140.00$93.00$5,133.60
2575.523EROSION CONTROL BLANKETS CATEGORY 3S Y14,081$1.20$16,897.20$1.11$15,629.91$1.26$17,742.06$1.94$27,317.14$1.15$16,193.15$1.25$17,601.25$1.11$15,629.91$1.10$15,489.10$1.11$15,629.91$1.40$19,713.40
2575.570RAPID STABILIZATION METHOD 2ACRE38.6$800.00$30,880.00$789.00$30,455.40$705.21$27,221.11$470.00$18,142.00$795.00$30,687.00$700.00$27,020.00$789.00$30,455.40$800.00$30,880.00$789.00$30,455.40$975.00$37,635.00
 Totals for project SP 01-610-22 $2,448,102.90 $2,355,314.53 $2,399,796.07 $2,725,890.13 $2,450,865.03 $2,427,818.85 $2,489,793.51 $2,747,088.05 $2,921,054.97 $3,073,703.20
 
Contract Total:$4,797,893.90$4,978,697.28$4,999,318.90$5,117,863.36$5,122,827.98$5,245,440.15$5,455,768.11$5,471,352.15$5,499,003.47$5,694,554.55